About WASIM RAJA
-
Academic Level Master’s Degree
-
Age 33 - 37 Years
-
Gender Male
-
Industry Construction
-
Nationality Indian
About me
A seasoned Construction Manager with a wealth of experience in the MEP (Mechanical, Electrical, and Plumbing) construction field, particularly in medium voltage infrastructure, low voltage, and mechanical works. With a background in managing projects in the Kingdom of Saudi Arabia, you possess a strong understanding of international standards and have worked with various stakeholders, including technical teams, design teams, QA/QC teams, procurement teams, sub-contractors, and clients..
Education
-
2021 - 2023
DR D Y PATIL UNIVERSITY, INDIA
MASTER OF BUSINESS ADMINISTRATION
I HAVE COMPLETED MY MASTER OF BUSINESS ADMINISTRATION MAJOR PROJECT PROJECT MANAGEMENT FROM DR D Y PATIL UNIVERSITY, INDIA 2023
-
2009 - 2013
JAIPUR NATIONAL UNIVERSITY, INDIA
ELECTRICAL ENGINEER
I HAVE PASSED Bachelor of Technology in Electrical Engineering FROM JAIPUR NATIONAL UNIVERSITY, INDIA MAJOR ELECTRICAL ENGINEER
Experience
-
2021 - Present
First Fix Co.
CONSTRUCTION MANAGER
Supervises the MEP scope of work in assigned project and ensures its completion within
budgeted time, cost and quality standards while complying with the regulations of the
relevant authorities Liaising with engineers and clients to ensure overall customer
satisfaction.
Optimizes overall staff, manpower, equipment, and materials allocation on site.
Assists Project Manager– MEP/ MEP Manager with preparation of Project Schedule,
Manpower Schedule, Material Log, and drawing log, and any changes thereof in
coordination with Planning and Cost Control Units for initial project planning.
Issues all site-related material requisition forms using Product Catalogue, coordinates
purchase and delivery of required materials in coordination with Procurement Department
and oversees inflow/outflow of site store materials.
Analyzing and approving various construction and engineering plans.
Diagnosing problems and troubleshooting equipment.
Ensuring all deadlines and budgetary requirements are met.
Responsible for issuing instructions to the site staff to complete the work in accordance
with accordance with the project plan, schedules, specifications, contract, and allocated
resources.
Responsible for monitoring all sub-contractor works to ensure that the works are as per
the job specifications, timeline, and contract requirements.
Corresponds with consultants and sub-contractors on site-related matters and ensures good
relations with them.
Conducts daily meetings with site staff to organize work scope for the day/next day.
Ensures that the quality of material and installation of work is in accordance with the
acceptance criteria identified for the project.
Attends weekly meetings with the Project Manager, Project Engineers, and Site Engineers
for look-ahead schedule.
Responsible for the issuance of weekly and monthly progress reports and progress
photographs.
Responsible for the safety at site by coordinating with the site engineer and the safety
officer.
Held construction and installation teams accountable for performance against specific
schedules and man-hour budgets. -
2016 - 2021
First Fix Co.
Sr. Electrical Project Engineer
Plan and coordinate the installation of MV/LV electrical systems, including transformers,
switchgear, MV/LV cables, protection devices, and other related equipment.
Plan and coordinate, design, technical quires and installation of Firefighting Pump-room
electrical systems, Irrigation pump room, Water Feature pump room, Chiller pump
rooms, pumps stations, water treatment, related all electrical work.
Review electrical drawings, specifications, Method of statement and technical documentation
to ensure compliance with project requirements and standards.
Coordinate with external stakeholders and third-party subcontractor, for the electrical
installation.
Observes onsite construction and determine if construction elements are being installed,
formed, and executed properly.
Performs quality assurance tasks, ensures contractor’s work is properly inspected and
corrective actions take place, ensures materials meet contract, reviews contractor submitting
for compliance with contract requirements, and resolves conflicts.
Monitors the construction contractor’s quality assurance and safety program.
Prepares Monthly Progress Reports and attends meetings summarizing project status, with
emphasis on engineering.
Monitors construction progress the project schedule and submits weekly progress reports with
recommendations based on the technical review of project documents and field inspections.
Provides Quality Assurance for ongoing projects. -
2014 - 2016
ICAD
Electrical Engineer
Supervised teams in installing and maintaining MV, And LV systems, overseeing safety
and operational efficiency.
Kept and updated records on all electrical design changes.
Continually improved methods and procedures for processes, measurement, documenting
and workflow teams.
Created technical documentation to facilitate knowledge transfer within the team.
Conducted risk assessments for electrical installations, maintaining safety and reliability.
Assessed electrical systems performance for optimal functionality.
Observes onsite construction and determines if construction elements are being installed,
formed, and executed properly.
Maintain on a day-to-day basis potential technical, commercial, and contractual issues.
Solves problems using a variety of standard methods, applying standard techniques
involving only minor innovations of methodology to provide solutions to problems with a
limited number of variables. -
2013 - 2014
Maksi Consultant Ltd.
Electrical site engineer
Evaluated electrical installations and systems to isolate faults and implement corrective
actions.
Lead the monitoring of electrical erection and construction of the following:
– Erection of generator, step up transformer, MDBs, MCC
– Erection of MV and LV switchgear
– Installation and termination of cabling
– Control on a day-to-day basis potential technical, commercial, and contractual issues.
Coordinated materials delivery and organization to maintain smooth flow of work.
Checked work quality and compliance with design specifications.
Kept and updated records on all electrical design changes.
Continually improved methods and procedures for processes, measurement, documenting, and
workflow techniques.
Honors & awards
-
2024
BEST CONSTRUCTION MANAGER
I GOT THIS AWARD FOR MY EXTRAORDINARY PERFORMANCE
