About WASIM RAJA

  • Academic Level  Master’s Degree
  • Age  33 - 37 Years
  • Gender  Male
  • Industry   Construction
  • Nationality  Indian
  • Profession in Iqama   Electrical Engineer
  • Are You Currently Located in Saudi Arabia?  Yes

About me

A seasoned Construction Manager with a wealth of experience in the MEP (Mechanical, Electrical, and Plumbing) construction field, particularly in medium voltage infrastructure, low voltage, and mechanical works. With a background in managing projects in the Kingdom of Saudi Arabia, you possess a strong understanding of international standards and have worked with various stakeholders, including technical teams, design teams, QA/QC teams, procurement teams, sub-contractors, and clients..

Education

  • 2021 - 2023
    DR D Y PATIL UNIVERSITY, INDIA

    MASTER OF BUSINESS ADMINISTRATION

    I HAVE COMPLETED MY MASTER OF BUSINESS ADMINISTRATION MAJOR PROJECT PROJECT MANAGEMENT FROM DR D Y PATIL UNIVERSITY, INDIA 2023

  • 2009 - 2013
    JAIPUR NATIONAL UNIVERSITY, INDIA

    ELECTRICAL ENGINEER

    I HAVE PASSED Bachelor of Technology in Electrical Engineering FROM JAIPUR NATIONAL UNIVERSITY, INDIA MAJOR ELECTRICAL ENGINEER

Experience

  • 2021 - Present
    First Fix Co.

    CONSTRUCTION MANAGER

     Supervises the MEP scope of work in assigned project and ensures its completion within
    budgeted time, cost and quality standards while complying with the regulations of the
    relevant authorities Liaising with engineers and clients to ensure overall customer
    satisfaction.
     Optimizes overall staff, manpower, equipment, and materials allocation on site.
     Assists Project Manager– MEP/ MEP Manager with preparation of Project Schedule,
    Manpower Schedule, Material Log, and drawing log, and any changes thereof in
    coordination with Planning and Cost Control Units for initial project planning.
     Issues all site-related material requisition forms using Product Catalogue, coordinates
    purchase and delivery of required materials in coordination with Procurement Department
    and oversees inflow/outflow of site store materials.
     Analyzing and approving various construction and engineering plans.
     Diagnosing problems and troubleshooting equipment.
     Ensuring all deadlines and budgetary requirements are met.
     Responsible for issuing instructions to the site staff to complete the work in accordance
    with accordance with the project plan, schedules, specifications, contract, and allocated
    resources.
     Responsible for monitoring all sub-contractor works to ensure that the works are as per
    the job specifications, timeline, and contract requirements.
     Corresponds with consultants and sub-contractors on site-related matters and ensures good
    relations with them.
     Conducts daily meetings with site staff to organize work scope for the day/next day.
     Ensures that the quality of material and installation of work is in accordance with the
    acceptance criteria identified for the project.
     Attends weekly meetings with the Project Manager, Project Engineers, and Site Engineers
    for look-ahead schedule.
     Responsible for the issuance of weekly and monthly progress reports and progress
    photographs.
     Responsible for the safety at site by coordinating with the site engineer and the safety
    officer.
     Held construction and installation teams accountable for performance against specific
    schedules and man-hour budgets.

  • 2016 - 2021
    First Fix Co.

    Sr. Electrical Project Engineer

     Plan and coordinate the installation of MV/LV electrical systems, including transformers,
    switchgear, MV/LV cables, protection devices, and other related equipment.
     Plan and coordinate, design, technical quires and installation of Firefighting Pump-room
    electrical systems, Irrigation pump room, Water Feature pump room, Chiller pump
    rooms, pumps stations, water treatment, related all electrical work.
     Review electrical drawings, specifications, Method of statement and technical documentation
    to ensure compliance with project requirements and standards.
     Coordinate with external stakeholders and third-party subcontractor, for the electrical
    installation.
     Observes onsite construction and determine if construction elements are being installed,
    formed, and executed properly.
     Performs quality assurance tasks, ensures contractor’s work is properly inspected and
    corrective actions take place, ensures materials meet contract, reviews contractor submitting
    for compliance with contract requirements, and resolves conflicts.
     Monitors the construction contractor’s quality assurance and safety program.
     Prepares Monthly Progress Reports and attends meetings summarizing project status, with
    emphasis on engineering.
     Monitors construction progress the project schedule and submits weekly progress reports with
    recommendations based on the technical review of project documents and field inspections.
     Provides Quality Assurance for ongoing projects.

  • 2014 - 2016
    ICAD

    Electrical Engineer

     Supervised teams in installing and maintaining MV, And LV systems, overseeing safety
    and operational efficiency.
     Kept and updated records on all electrical design changes.
     Continually improved methods and procedures for processes, measurement, documenting
    and workflow teams.
     Created technical documentation to facilitate knowledge transfer within the team.
     Conducted risk assessments for electrical installations, maintaining safety and reliability.
     Assessed electrical systems performance for optimal functionality.
     Observes onsite construction and determines if construction elements are being installed,
    formed, and executed properly.
     Maintain on a day-to-day basis potential technical, commercial, and contractual issues.
     Solves problems using a variety of standard methods, applying standard techniques
    involving only minor innovations of methodology to provide solutions to problems with a
    limited number of variables.

  • 2013 - 2014
    Maksi Consultant Ltd.

    Electrical site engineer

     Evaluated electrical installations and systems to isolate faults and implement corrective
    actions.
     Lead the monitoring of electrical erection and construction of the following:
    – Erection of generator, step up transformer, MDBs, MCC
    – Erection of MV and LV switchgear
    – Installation and termination of cabling
    – Control on a day-to-day basis potential technical, commercial, and contractual issues.
     Coordinated materials delivery and organization to maintain smooth flow of work.
     Checked work quality and compliance with design specifications.
     Kept and updated records on all electrical design changes.
     Continually improved methods and procedures for processes, measurement, documenting, and
    workflow techniques.

Expertise

PMP-PMI
Chartered Engineer (C.Eng)
ISO 2009
Six Sigma
Problem Solving skills
Communication Skills
Leadership and Team Development

Languages

ENGLISH
Proficient
ARABIC
Intermediate
URDU
Proficient
HINDI
Proficient

Honors & awards

Skills

Leave Your Review

  • Overall Rating 0

Almost there!

Let’s quickly read the following points to proceed to job posting.

You Can Post and Review Candidates Completely Free of Charge.

To Ensure Transparency and A Smooth Process, Please Review and Confirm the Following Terms: